1. For concrete faced rockfill dam, the slope of upstream and downstream is generally 1:1.3—1:1.7.The no-rail slip-form construction technology for facing concrete has been a ripe technological measure.
对于混凝土面板堆石坝而言,堆石坝上下游坡比一般在1∶1.3~1∶1.7之间,其面板混凝土采用无轨滑模施工已是相当成熟的一项技术措施了。
2. So even if it is facing a cash crunch, it would not necessarily slip into default – an event that all parties agree would have grave consequences.
所以即使面临现金短缺,它也不会破产,所有各方都认为那将是严重的后果。
3. The Selection of Electrolytes for Clay Slip of Ceramic Facing Bricks
饰面砖泥浆用电解质的选择